No. A2713 Xinggang International Square Huangqi Jianshe Road Dali Town Nanhai District Foshan Guangdong China
Home ProductsQuick Drying Metal Primer

Offshore Metal Structure Quick Drying Metal Primer Wearing Resistant Two Component

Offshore Metal Structure Quick Drying Metal Primer Wearing Resistant Two Component

    • Offshore Metal Structure Quick Drying Metal Primer Wearing Resistant Two Component
    • Offshore Metal Structure Quick Drying Metal Primer Wearing Resistant Two Component
  • Offshore Metal Structure Quick Drying Metal Primer Wearing Resistant Two Component

    Product Details:

    Place of Origin: FoShan China
    Brand Name: Phresh/YiMei
    Certification: ISO SGS NQA ROHS
    Model Number: PHRESH-8017

    Payment & Shipping Terms:

    Minimum Order Quantity: Negotiable
    Price: Negotiable
    Packaging Details: 4.8KG,5KG,10KG,25KG
    Delivery Time: 7 days
    Payment Terms: 7days Western Union, T/T, L/C, MoneyGram
    Supply Ability: 10000KGS/DAY
    Contact Now
    Detailed Product Description
    Application: Equipment, Pipe, Steel Structure Feature: Wash Resistant
    Construction Tempareture: Construction Temperture: 0 - 40℃ Color: Color Card
    Certificate: ISO9001 Main Raw Material: Acrylic

    Offshore Metal Structure Quick Drying Metal Primer Wearing Resistant Two Component

     

    Product description


    This product consists of epoxy resin,zinc powder,pigments and additives composed of two-component

    anti-rust primer,with excellent corrosion resistance.

     

    Features

    With cathodic protection,excellent rust resistance

    Excellent adhesion on sandblasted steel

    Has a good welding performance

    Has good water resistance,oil resistance and solvent resistance

    Dry and fast,with good construction performance

     

    Scope of application

    It can be applied to the painting of steel structures,storage tanks,bridges,etc.It can also be used for anti-corrosion coating of chemical plants,chemical fertilizer plants,power plants,oil refineries,paper mills and sewage treatment plants.

     

    Offshore Metal Structure Quick Drying Metal Primer Wearing Resistant Two Component

    Basic paramerers

    Specific weight about 0.85kg/L
    Dry film thichness 60µm
    Wet film thickness 120µm
    Theoretical dosage 150/㎡
    Formulation:Part A:Drier:Water 10:1:1(weight ratio)
    Drying time (25℃)Dry≤th Dry≤24h Completely dry 7 days
    Curing time (20℃)30min
    Applicable period (20℃)5h

     

    Items Indicator Testing method Items Indicator Testing method
    Color Various colors GB/T9281-2008 Alkali resistance

    No abnormality

    within 30d

    GB/T9274-1988
    Solid content 54~57% GB/T1725-2007

    Solar heat

    reflection

    ≥70% (0.3-1.3μm) JC/T1040-2007
    Specific weight 1.2±0.05g/cm3 GB/T6750-2007 Sphere reflection ≥70% (0.3-1.3μm) JC/T1040-2007
    Theoretical coverage 7~8m2/kg(50μm) Calculated value

    Thermal

    conductivity

    ≤0.25W/cm.K JC/T1040-2007
    Drying time

    Surface drying:

    ≤1.5h (25℃)

    GB/T1728-1979

    Salt fog

    resistance

    No abnormality

    within 1000h

    GB/T1771-2007

    Hard drying:

    ≤24h (25℃)

    GB/T1728-1979

    Aging

    resistance

    No abnormality

    within 1000h

    GB/T1865-2009

     

    Apply To

     

     

    Precautions

    • Thoroughly stir the B component thoroughly before use,and mix the A and B components by mixing until they are ready for use.
    • During the construction of high temperature season,dry spraying is easy to occur.To prevent the dry spray phenomenon from occurring,special thinner must be added to adjust the dry spraying.
    • Before coating after coating,must completely remove the surface of zinc salt to prevent affecting the paint film adhesion.
    • The paint storage ventilation,cool,dry place,the construction site should strengthen the ventilation exhaust.

    Product features:


     

     

     

    Notes

    The data, usage, and recommendations of the above products are based on experimental and actual use experience and are only used as a construction reference.

    For the construction that we cannot meet the situation,our company only guarantees the quality of paint products.

    If there is any change in the above data,the latest information of the company shall prevail.No further notice will be given.

     

    Construction Guide

    Relative humidity 80% or less
    Mixing ratio:Main paint Main paint:Part B:water=10:1:1(weight ratio)

    Stir for 15 minutes with a mechanical stirrer until uniform and dilute with appropriate amount of water.

    Available after mixing:4 hours(20℃)

    Curing period 5 minutes
    Drying time Table dry≤30 minutes hard work≤24 hours
    Repainting time 24 hours
    Construction methods brushing,roller coating or spraying

     

    Contact Details
    FOSHAN PHRESH NEW MATERIAL TECHNOLOGY CO., LTD

    Contact Person: Tonney

    Tel: +8613760867636